Construction to the finish – Diffusively closed Vario Standard

Platné od 1.1.2016. Zadávací listina stavby zpřesňuje tento standard.

Engineering activity

- project for building permission and production documents – contractor
- building permission – customer

Lower construction – customer

Accuracy of performance of the foundation slab – maximum difference in proportions ±1 cm, diagonals ±2 cm, height-altitude tolerance ±0.3 cm.

The infrastructure necessary for launching the construction

- NN 220 V electricity supply at a distance of 10 m from the construction (in particular examples also 380 V, 25 A)
- water at a distance of 15 m from the building
 

Upper construction – contractor

1. Outer walls approx. 310 mm
(Composition of the walls from inside to outside)
12.5 mm Rigistabil 15 mm ACTIV air
40 mm installation forewall 4 cm
moisture barrier (PVC foil)
120 mm wooden construction
120 mm ISOVER isolation
15 mm Rigistabil
120 mm polystyrene coating
3.5 mm mesh with a plaster base layer
1-3 mm white silicon coating

2. Inner walls approx. 130 mm
(composition of the walls from inside to outside)
15 mm Rigistabil ACTIV air
100 mm wooden construction
80 mm ISOVER isolation
15 mm Rigistabil ACTIV air
 

Implementation of plasterboard sealant according to the Rigips Q2standard

3. Construction of the ceiling 280 mm
(direction from the bottom to the upper part)

house with an attic:
15 mm plasterboard
28 mm CD profiles or wooden grate
80 mm ISOVER isolation
220 mm ceiling beams (according to the statistics)
18 mm OSB board (according to the statistics)



single-storey house
12.5 mm plasterboard
moisture barrier
28 mm CD profiles or wooden grate
ceiling beam construction
250 mm blown insulation (paper cellulose)

Implementation of plasterboard sealant according to the Rigips Q2standard

4. Roofing construction
roofing material concrete tile with accessories for gorge, groin, ridge, 1 x ventilation permeable tile (drainage)

house with an attic
contra levelling, roof levelling
roof foil diffusion
rafters 80 x 180 mm with machined ending
180+40 mm isolation ISOVER
0.03 mm steam barrier (foil PVC)
12.5 mm plasterboard

single-storey house:
contra levelling, roof leveling
roof foil
roof beam construction
underhammer floorboards

Implementation of plasterboard sealant according to the Rigips Q2standard

5. Construction of the roof
All roof constructions are made at a pressure of 1.9 KN/m2.
Type: gable roof, beam set, ending in a rafter with a worked ending.

6. Gutters and drainpipes
galvanized sheet

7. Windows and balcony doors
Plastic, white. Thermal resistance of the glass U = 1.1. Clear glass without wire mesh.
Sealing + metal device to open the window (handle, hinge).
Non-opening windows in the project marked as fixed.
Roof window Fakro Thermo Plus 78x118 cm.

8. Windowsills
Outer sills aluminium.
Inner sills plastic.

9. Shades and blinds are not part of the standard version.
On request outer aluminium laminated shades can be added, controlled from inside by a tape with a brake mechanism in the wall. 

10. Entrance doors and gates
The doors are white and plastic and cost CZK 25,000.

Hörmann 250x212.5 cm sectional garage door, white, manual groove M, woodgrain surface.

11. Interior staircase
All interior stairs are of solid beech wood.The staircase is equipped with underscale.
Railings – the vertical bars of the railings are straight and without decoration. Surface treatment clear lacquer.

12. Balcony
The standard offer does not include any balconies or loggias, roller blinds, window shutters or similar components.

The rest

The construction is completed to a standard design. It does not include any technological or mechanical devices. Any equipment or devices shown in the plans or sales brochures serve only as offers of equipment and are not a contractual part of the work. Any work the customer carries out on the basis of the written contract in the construction diary will be deducted from the price of the final settlement according to the budget prices of the contractor. At the customer’s request, the standard can be changed.

A record of the handover of the construction between the contractor and the customer will be prepared by the contractor. 